Work on the Melton Garage is finished!
October 2, 2003

 
Lower right is the RV garage (big door).  Lower left is normal car garage.  

Upper right (with round top window) is a 30x15 hobby room.  

Upper left is an exercise room with a deck overlooking the moutains.  Our house is on the extreme left with a normal garage in view. 

Left:  the new garage from the rear.    The basement of the garage (black door) is a shop and storage area. 
The view from the street giving an idea 
of the setting.  The garage is on the  right, house is on the left.  Picture taken just
before the leaves came back on most of the trees in April.
One end of the train room. 
The model railroad is barely under construction.
More train construction pictures.
One end of the exercise room.
Above:  front of house. 

Ellis at his home-away-from home: 
Lowe's Home Improvement Center